Multiple single-category teams, tailored to your one-stop needs. Covering apparel, bags & totes, and outdoor products.
The following data reflects our current production capacity.
| Item | Value | Notes |
|---|---|---|
| Factory Area | 800㎡ | — |
| Warehouse Area | 400㎡ | — |
| Employees | 56+ | — |
| Monthly Capacity | Approx. 30,000 pcs | By category |
| Main Categories | Pants, Workwear, Functional Tops, Bags & Totes, Outdoor Products | — |
| MOQ | Pants 300 pcs / Workwear 300 pcs / Functional Tops 200 pcs / Bags & Totes 500 pcs | By category |
| Bulk Lead Time | Pants 15-20 days / Workwear 20-25 days / Functional Tops 20-30 days | By category, counted from sample approval |
From cutting and sewing to finishing, QC, and packing — in-house production lines, organized by order.






We support sample-based and drawing-based development. Below is our typical sampling process.
| Stage | Content | Lead Time | Notes |
|---|---|---|---|
| 1. Requirement Confirmation | Confirm category, fabric, craftsmanship, and quantity | 1-2 business days | Client provides sample garment or Tech Pack |
| 2. Sampling Quotation | Issue sampling fee and lead time | 1 business day | Assessed based on style complexity, fabric cost, and craftsmanship requirements |
| 3. Sample Production | Produce the sample | Pants 7-10 days / Workwear 10-12 days / Functional Tops 12-15 days | Complex craftsmanship or styles requiring new molds are assessed separately |
| 4. Client Approval | Client approves the sample or requests revision | Client-determined | 2 rounds of revision free of charge; additional rounds charged by actual labor and material cost |
| 5. Bulk Production | Bulk production begins after sample approval | — | Sampling fee fully refunded when bulk order reaches 500 pcs |
Bulk production begins after sample and contract confirmation.
| Stage | Content | Notes |
|---|---|---|
| Scheduling | Assigned by category to the corresponding production team | Pants / Workwear / Functional Tops scheduled by dedicated teams |
| Production Lead Time | Starts after sample approval and deposit payment | Pants 15-20 days / Workwear 20-25 days / Functional Tops 20-30 days |
| Progress Updates | Weekly production updates | With on-site workshop photos; key milestones notified separately |
| Mid-Production Inspection | Inspection can be arranged mid-production | Clients or third-party agencies welcome on-site; book 3 days in advance |
| Shipping | Ship as agreed | Tracking number and packing list provided |
QC checkpoints are set at cutting, sewing, finishing, and packing stages.
| Stage | Content | Standard |
|---|---|---|
| Incoming Fabric Inspection | Check color variation, weight, and defects | Color variation at Grey Scale Grade 4 or above; weight tolerance ±5%; batches with obvious defects returned |
| Cutting Inspection | Check panel dimensions, quantity, and direction | Dimension tolerance ±0.5cm; quantity and direction verified against pattern sheet |
| In-Process Sewing Inspection | Check stitching, dimensions, appearance, and trims | Stitch density 3-4 stitches/cm; no skipped or broken stitches; dimension tolerance ±1cm |
| Final Inspection | Random sampling by AQL standard | AQL 2.5 (major defects) / 4.0 (minor defects) |
| Pre-Shipment Inspection | Check packing, labels, quantity, and carton | 100% verification against packing list; label content matches order |
Clients may arrange third-party inspection agencies (such as SGS, BV, Intertek) for on-site inspection.